ECOFIN PU Liquid Membrane
Applications
OSB ROOF

WARM ROOF

OVERLAY

CORRUGATED SHEET

CONCRETE ROOF

GREEN ROOF

Benefits

UV resistance

Fire resistance
Ecofin membranes hold Broof T4 fire classification.

All year
Ecofin can be installed all year.

NHBC
Approved for NHBC projects.

Sustainability
Certified Lifespan in excess of 25 years.

Guarantees
Available for 15, 20 and 25 years.

Excellent adhesion

Environmentaly friendly

Safe application
No naked flames required.

Trafficable

aesthetics

technical support
Technical reports and CAD drawings available.

certifications
Certified to the highest standards and BBA approval.

Certifications
Certified for green roofs.
Product range
PRODUCT | DESCRIPTION | KG/LTS | COVERAGE | DRYING TIME |
---|---|---|---|---|
ECOFIN PU | Liquid membrane | 15kg drums |
8-10 sqm | 2-6 hours *Depending on temperature and humidity. Fully cured in 24hrs |
ECOFIN MULTISEAL | Clear membrane as sealing coat or primer | 5Lts | 10-30 sqm *Depending on application |
2-4 hours |
ECOFIN PROTECT | UV resistant topcoat | 5Lts | 20-30 sqm | 1-2 hours |
ECOFIN MATT | Reinforcing matt | -- | 20x1 sqm 60x1 sqm |
-- |
STORAGE 5-25ºC – protect from frost and direct sunlight.
Also available other sizes.
Application guide
- Check the substrate is clean and in good condition.
- Application temperature must be between 2 – 35ºC.
- All trims must be fixed prior to Ecofin PRO application.
- Use a PU sealant to seal any cracks or gaps.
- Open the drum and stir before applying Ecofin PRO.
- If product is left to stand on site, stir again before application.
- Apply Ecofin PRO liquid as described below, first to details and perimeters and then to the flat area.
- Apply Ecofin PRO liquid wet-on-wet by applying a generous coat of liquid first, then dry rolling the matting into the liquid and finally applying more liquid on top to achieve the required thickness. Ensure the matting is fully encapsulated without pinholes or tenting.
- At this stage the roof is watertight and will resist rain.
- Typical coverage is 8-10 sqm per drum although this may vary depending on substrate.
- After applying the waterproofing layer check for pinholes or any dry areas that may require more liquid.
- Once the Ecofin PRO membrane is dry, apply a layer of Ecofin Protect topcoat within 48 hours.
- Check the full application sheet for specific substrates and systems.

Use of Multiseal Primer
Concrete
Asbestos
Bitumen membrane
TPO single ply
EPDM membrane
Asphalt
OSB / Plywood
Metal
PVC single ply
Contact
Call +44(0) 3304 004457 or use the form below: